Accsoon TopRig S60 is a motorized camera slider with 425 mm of carriage travel for controlled product shots, interviews, macro work and telephoto lenses. Its brushless motor provides adjustable speed from 0.1 to 5 cm/s, A/B endpoints, repeat movement and an S-curve soft start/stop. It supports up to 4 kg horizontally and 2.5 kg vertically, with onboard controls…
Accsoon TopRig S60 is a motorized camera slider with 425 mm of carriage travel for controlled product shots, interviews, macro work and telephoto lenses. Its brushless motor provides adjustable speed from 0.1 to 5 cm/s, A/B endpoints, repeat movement and an S-curve soft start/stop. It supports up to 4 kg horizontally and 2.5 kg vertically, with onboard controls or the TopRig Bluetooth app for iOS and Android. Power comes from an optional NP-F battery or a DC 9–16.8 V supply; a camera-specific control/shutter cable is required for synchronized recording or time-lapse.
Accsoon TopRig S60 adds repeatable camera movement to product videos, interviews and macro shots. A brushless motor, adjustable A/B endpoints and mechanical panning help you build a shot with up to 4 kg horizontally or 2.5 kg vertically.


Set 0.1–5 cm/s with the speed knob. Choose A/B endpoints, start the carriage and select a single run or continuous looping on the panel. The TopRig Bluetooth app offers remote control.
The brushless drive uses an S-curve to ease into and out of movement. The graph illustrates the transition, not a fixed duration for every shot.


Mechanical panning links travel to a 55° sweep for stationary-subject tracking. Straight travel is also available. Payload is up to 4 kg horizontally and 2.5 kg vertically.
Power the slider with an NP-F550, NP-F750 or NP-F970 battery or a DC 9–16.8 V supply. Rated consumption is 0.5 W. Battery and supply are sold separately.

Controlled motion supports product videos, macro work and telephoto framing. Calibrate the slider before use. The TopRig iOS and Android app provides motion settings, calibration, firmware updates and time-lapse. Synchronized stills require a separately purchased camera-specific shutter cable; recording control uses the appropriate camera control cable.
The central base has 3/8″ and 1/4″ mounting points. Accsoon quotes at least 60 hours of horizontal operation with a 3200 mAh NP-F550 under its test conditions; actual runtime depends on the battery, load and movement. Battery, supply, ball head and camera cable are not included. The Accsoon TopRig Ball Head is rated for 3 kg; use the lowest load limit of the complete setup. S60 adds 1/4″ mounting points at the ends and sides of the longer rail.
| Manufacturer: | Accsoon |
| Category: | Slider sets |
| Travel Distance | 425mm |
| Horizontal load capacity | 4kg |
| Vertical load capacity | 2.5kg |
| Travel Speed Range | 0.1x5cm/s |
| Dimensions (L × W × H) | 610x106x71.3mm |
| Input DC Voltage | 9x16.8V |
| Rated voltage | 7.4x16.8V |
| Power Consumption | 0.5W |
| Panoramic angle | 55° |
| Power Supply | External DC · NP-F Battery |
| Controls | Bluetooth Apps · Buttons and a rotary control |
| Movement Functions | Repeated travel · Setting Points A/B · Smooth acceleration and braking · Time-lapse |
| Color | Black |
| Body Material | Metal |
| Engine Type | Brushless |
| Camera Platform Mounting Screw | 1/4″ · 3/8″ |
| Mounting Thread on the Base | 1/4″ · 3/8″ |
| Supported Batteries | NP-F550 · NP-F750 · NP-F970 |
| Connectors | CAMERA (3.5 mm) · DC IN (2.1 mm) · USB-C (5 V OUT) |
| USB output voltage | 5V |
| Weight | 1.5kg |
Special offers and discounts for subscribers only · Free audio & video workshops · News and tips from the world of filmmaking