Accsoon TopRig S40 Video Slider

Accsoon TopRig S40 is a motorized camera slider with 225 mm of carriage travel for controlled product shots, interviews, macro work and telephoto lenses. Its brushless motor provides adjustable speed from 0.1 to 5 cm/s, A/B endpoints, repeat movement and an S-curve soft start/stop. It supports up to 4 kg horizontally and 2.5 kg vertically, with onboard controls…

More information

338 € with VAT 279.34 € without VAT
-+
Availability
Shipment day: 02. 12.
> 5 pcs in stock at the supplier
Product description SPECIFICATIONS PACKAGE CONTENT

Product description

Accsoon TopRig S40 is a motorized camera slider with 225 mm of carriage travel for controlled product shots, interviews, macro work and telephoto lenses. Its brushless motor provides adjustable speed from 0.1 to 5 cm/s, A/B endpoints, repeat movement and an S-curve soft start/stop. It supports up to 4 kg horizontally and 2.5 kg vertically, with onboard controls or the TopRig Bluetooth app for iOS and Android. Power comes from an optional NP-F battery or a DC 9–16.8 V supply; a camera-specific control/shutter cable is required for synchronized recording or time-lapse.

ACCSOON TOPRIG S40

Controlled 225 mm moves

Accsoon TopRig S40 adds repeatable camera movement to product videos, interviews and macro shots. A brushless motor, adjustable A/B endpoints and mechanical panning help you build a shot with up to 4 kg horizontally or 2.5 kg vertically.

225 mm0.1–5 cm/sNP-F / DC
Accsoon TopRig S40
Set the shot on the slider

Panel and A/B points

Set 0.1–5 cm/s with the speed knob. Choose A/B endpoints, start the carriage and select a single run or continuous looping on the panel. The TopRig Bluetooth app offers remote control.

Smooth start and stop

The brushless drive uses an S-curve to ease into and out of movement. The graph illustrates the transition, not a fixed duration for every shot.

A smooth start and finish
Slide and pan together

Slide and pan

Mechanical panning links travel to a 55° sweep for stationary-subject tracking. Straight travel is also available. Payload is up to 4 kg horizontally and 2.5 kg vertically.

NP-F or DC

Power the slider with an NP-F550, NP-F750 or NP-F970 battery or a DC 9–16.8 V supply. Rated consumption is 0.5 W. Battery and supply are sold separately.

NP-F power for location work

Prepare the setup and time-lapse

Controlled motion supports product videos, macro work and telephoto framing. Calibrate the slider before use. The TopRig iOS and Android app provides motion settings, calibration, firmware updates and time-lapse. Synchronized stills require a separately purchased camera-specific shutter cable; recording control uses the appropriate camera control cable.

Mounting and runtime

The central base has 3/8″ and 1/4″ mounting points. Accsoon quotes at least 60 hours of horizontal operation with a 3200 mAh NP-F550 under its test conditions; actual runtime depends on the battery, load and movement. Battery, supply, ball head and camera cable are not included. The Accsoon TopRig Ball Head is rated for 3 kg; use the lowest load limit of the complete setup.

PACKAGE CONTENT

  • Accsoon TopRig S40 slider ×1
  • Spare drive belt ×1
  • User manual ×1
  • Quality certificate ×1
  • Hex key ×1

SPECIFICATIONS

  • Model: ACC-AA-S01
  • Carriage travel: 225 mm
  • Speed range: 0.1–5 cm/s
  • Horizontal payload: 4 kg
  • Vertical payload: 2.5 kg
  • Tracking / panoramic angle: 55°
  • Rated voltage: 7.4–16.8 V
  • DC input: 9–16.8 V
  • Battery compatibility: NP-F550 / NP-F750 / NP-F970
  • Rated consumption: 0.5 W
  • Control: Onboard panel / TopRig app via Bluetooth
  • Motion: A/B endpoints, loop, time-lapse, S-curve start/stop
  • Dimensions (L × W × H): 410 × 106 × 71.3 mm
  • Weight: 1.4 kg
  • Connectors: 2.1 mm DC input; 5 V USB-C output; 3.5 mm CAMERA shutter-control port
Parameters

Parameters

Manufacturer: Accsoon
Category: Slider sets

Main parameters

Travel Distance225mm
Horizontal load capacity4kg
Vertical load capacity2.5kg
Travel Speed Range0.1x5cm/s
Dimensions (L × W × H)410x106x71.3mm
Input DC Voltage9x16.8V
Rated voltage7.4x16.8V
Power Consumption0.5W
Panoramic angle55°
Power SupplyExternal DC · NP-F Battery
ControlsBluetooth Apps · Buttons and a rotary control
Movement FunctionsRepeated travel · Setting Points A/B · Smooth acceleration and braking · Time-lapse
ColorBlack
Body MaterialMetal
Engine TypeBrushless
Camera Platform Mounting Screw1/4″ · 3/8″
Mounting Thread on the Base1/4″ · 3/8″
Supported BatteriesNP-F550 · NP-F750 · NP-F970
ConnectorsCAMERA (3.5 mm) · DC IN (2.1 mm) · USB-C (5 V OUT)
USB output voltage5V
Weight1.4kg
ACCESSORIES (4)

ACCESSORIES (4)

SmallRig NP-F970 USB-C Rechargeable Camera Battery 4267

  • LAST PIECE
The SmallRig NP-F970 4267 rechargeable battery holds 10,500mAh for a camera, LED
82 €
In stock 1 pcs

Accsoon TopRig Ball Head

Accsoon TopRig Ball Head ACC-BH-01 is an aluminium ball head for positioning a camera
60 €
Backordered 1 pcs

SmallRig NP-F550 USB-C Rechargeable Camera Battery 4331

An NP-F550 replacement battery that charges straight over USB-C — from a power bank
53 €
on request

Accsoon TopRig 100W 4-Bay NP-F Fast Charger

The Accsoon TopRig NP-F (ACC-BC-01) is a four-bay charger for NP-F550, NP-F750, NP-F970
59 €
on request
Alternative (3)